Excavation for the foundation as per approved plans, ensuring stability and safety.
Installation of formwork and shuttering to mold and support wet concrete until it cures.
Bending and fixing of steel rebar for footings and columns to provide tensile strength.
Pouring of structural and non-structural concrete, followed by proper curing.
Concreting for raft foundation to evenly distribute loads, especially in weak soil conditions.